Where the equipment fits
Review the electrical interface between the inverter system and the connection point. CANGO’s scope focuses on the applicable AC distribution, switching and transformer equipment; inverter selection and grid acceptance are determined by the project team and network requirements.
Typical equipment arrangement
- PV inverters (project scope)
- AC collection / grid connection equipment
- Step-up transformer, if required
- MV switching / connection point
Conceptual arrangement only, not a construction or protection drawing. Equipment sequence and scope depend on the project.
What to confirm before selection
Send the available drawings and specifications with your inquiry.
- Inverter AC output and aggregate capacity
- Connection voltage and utility interface
- Protection, metering and isolation requirements
- Site environment and equipment supply boundaries