Prefabricated Substations
10kV-40.5kV Modular Prefabricated Cabin
Model 10kV-40.5kV
A modular prefabricated cabin for substation equipment, with an all-metal enclosure and configurable environmental control. Equipment layout, monitoring functions and installation requirements are reviewed against the project design.
Share your rated data, quantity and project requirements.
View this model in our 2026 catalog ↗
Product Overview
10 kV-40.5 kV modular intelligent prefabricated cabin provides a modular assembly option for substation projects. It is commonly used for wind power and photovoltaic booster stations and grid substation projects, with the final selection based on rated data, drawings, and site conditions.
EPC companies, electrical contractors, utilities, developers, and overseas distributors can request configuration review for prefabricated substation cabin. Please send transformer capacity, HV/LV voltage combination, enclosure layout, foundation drawing, and incoming / outgoing cable scheme, quantity, destination, and any project standard requirements for quotation.
Technical Specifications
| Group | Item | Unit | Parameter |
|---|---|---|---|
| Voltage range | kV | 10-40.5 | |
| Assembly | Modular prefabricated cabin substation | ||
| Cabin protection level | IP54 | ||
| Conventional outdoor substation reference area | About 3000 square meters | ||
| Prefabricated cabin substation reference area | About 2000 square meters | ||
| Conventional construction period | About 3-4 months | ||
| Prefabricated cabin construction period | About 1-2 months | ||
| Reference cable saving | About 30% |
Installation Dimensions / Drawing
Applications
- Wind power and photovoltaic booster stations
- Grid substation projects
- Industrial and mining self-use substations
Ordering Instructions / Information Required for Quotation
ORDERING INSTRUCTIONS
- State the required 10kV-40.5kV configuration, quantity, project destination, and intended application.
- Provide substation layout, transformer capacity, high-voltage scheme, low-voltage outgoing circuits, foundation drawing, and site environmental conditions for technical review.
- Confirm the final foundation, cable trench, grounding grid, lifting point, and enclosure interface drawing before final production or installation planning.
- List any special environmental, wiring, communication, metering, protection, or component requirements in the inquiry.